Embankment dam

Gansu Jiudianxia

 

Jiudianxia Water Control Project is YINTAO water supply project is the first in the alpine region, under high seismic intensity, high and steep slope and deep overburden conditions for the construction of the foundation level meter high concrete face rockfill dam. I assume Jiudianxia Water Control civil engineering, mechanical and electrical equipment installation engineering supervision (maximum height of 133m, the total installed capacity of 300MW)

 

Print | Close
[Previous]:Yellow Martha block
[Next]:Tibet ZHIKU Hydropower
XML 地图 | Sitemap 地图